windows & siding While the plumbers and electricians are in the house, Siding can be put on


insulate & sheetrock When the plumbers and elctricians are done You have an electrical inspection
After the inspection has passed code you can insulate the side walls
Then sheetrock gets put up on the ceiling first then the walls
Insulation is blown into the attic


paint & stain Stain and polyurethane the woodwork, make sure it is done away from any construction dust
After the sheetrock is taped and sanded smooth, primer paint is put on
Ceiling and walls are painted


flooring & door hanging After the painting is finished, the doors are hung
Flooring is put done and woodwork is put on


trim & cabinets Cabinets are brought in and
Carpet is installed last