You start your project by obtaining the permits and staking out your house.

basement Now the excavting contractor comes and
They dig the basement
Then the cement work gets done, concrete is poured or blocks are laid
After a few days the dirt is backfilled up against the foundation


floor system Now the framing contractor comes
They frame up the floor system


structure framed The framing contractor will frame up the walls
Put up the rafters and sheet everything
Tyvak gets stapled on the plywood


roof shingled & basement floor in The roof is shingled
Now the cement contractor can pour the basement floor


plumbing & electric The next step is to call the plumbing contractor
Then as they are finishing up the rough in work, The Electrical Contractor can start
They start pulling wires and walk through the house with you to figure out where you want any outlets